Strengthening the Power Grid With Large-Scale Batteries
The project aimed to install three battery energy storage systems at locations across SCE''s service area, with a total capacity of 537.5 megawatts, enough to power over 400,000 homes. The three sites, named Separator, Cathode and Anode, are located near existing substations in Rancho Cucamonga, Long Beach and Porterville.